Videos

NERC CIP, one rule at a time

Short explainers for solar, wind and battery storage operators: what a requirement asks, the deadline, and the evidence an auditor expects. New Shorts every weekday.

Explainer · 6 min
NERC CIP for solar, wind and battery sites: what actually applies to you

Whether a site is BES or Category 2 (registration alone does not bring CIP), why most BES plants rate low impact, the six sections of the CIP-003-9 plan, and when a fleet's control room crosses into medium impact.

Watch on YouTube · Category 2 registration and which standards apply

Explainer · 3 min
CIP-003-9 low impact requirements: the 6 sections of Attachment 1

What CIP-003-9 asks of low impact sites such as many solar, wind and battery plants: policies, the CIP Senior Manager and the six plan sections, including Section 6 on vendor remote access.

Watch on YouTube · CIP-003-9 low impact guide

Short · 31 s
Jurassic Park and your OT network

Devices nobody put on the list, like a cellular modem left from commissioning. Section 3 allows only necessary routable access, and you can only limit what you know is there.

Watch on YouTube · Asset inventory for inverter fleets

Short · 29 s
Is your laptop a Transient Cyber Asset?

A device connected for 30 consecutive calendar days or less that can transfer code. Low impact sites manage them under CIP-003-9 Section 5.

Watch on YouTube · NERC CIP glossary

Short · 28 s
CIP-004: the quarterly access review

At least once each calendar quarter, verify that everyone with electronic or unescorted physical access has an authorization record.

Watch on YouTube · The NERC CIP standards

Short · 21 s
Things an OT vendor says that should worry you

CIP-003-9 Section 6 asks low impact sites to know when vendors have remote access and be able to disable it.

Watch on YouTube · CIP-003-9 low impact guide

Short · 32 s
CIP-004: someone quits, you have 24 hours

On a termination action, remove unescorted physical access and Interactive Remote Access within 24 hours.

Watch on YouTube · The NERC CIP standards

Short · 19 s
POV: the auditor asks for your baselines

CIP-010 R1: when an authorized change deviates from the baseline, update the baseline within 30 calendar days.

Watch on YouTube · Free CIP-010 baseline checklist

Short · 29 s
What is an Electronic Security Perimeter?

Under CIP-005, high and medium impact systems with routable connectivity sit inside an ESP; traffic crosses only through an Electronic Access Point.

Watch on YouTube · OT network segmentation

Short · 35 s
CIP-008: the one-hour reporting rule

Once an incident is determined to be a Reportable Cyber Security Incident, initial notification to the E-ISAC (and CISA in the U.S.) is due within one hour.

Watch on YouTube · The NERC CIP standards

Short · 40 s
The 35-day patch clock in NERC CIP-007

Evaluate security patches at least every 35 calendar days, then apply, create a dated mitigation plan or revise one within 35 days.

Watch on YouTube · The NERC CIP standards

Short · 39 s
What goes in a NERC CIP-010 baseline? 5 items

Operating system or firmware, installed software, custom software, logical network accessible ports and security patches applied.

Watch on YouTube · Free CIP-010 baseline checklist

Short · 36 s
CIP-003-9 Section 6: vendor remote access at low impact sites

Three methods: know when vendors have remote access, be able to disable it, and detect malicious communications.

Watch on YouTube · CIP-003-9 low impact guide

Short · 35 s
The 15-month clock in NERC CIP

Why many CIP tasks run every 15 calendar months, and three that do.

Watch on YouTube · NERC CIP effective dates

General guidance, not legal or compliance advice. The standard text at nerc.com is authoritative.