Short videos, plain-language guides, free templates and tools, and the public enforcement data, for the people who run solar, wind and battery storage sites. Free, no sign-up.
Devices nobody put on the list, like a cellular modem left from commissioning. Section 3 allows only necessary routable access, and you can only limit what you know is there.
Whether a site is BES or Category 2 (registration alone does not bring CIP), why most BES plants rate low impact, the six sections of the CIP-003-9 plan, and when a fleet's control room crosses into medium impact.
A device connected for 30 consecutive calendar days or less that can transfer code. Low impact sites manage them under CIP-003-9 Section 5.
At least once each calendar quarter, verify that everyone with electronic or unescorted physical access has an authorization record.
CIP-003-9 Section 6 asks low impact sites to know when vendors have remote access and be able to disable it.
On a termination action, remove unescorted physical access and Interactive Remote Access within 24 hours.
What the CIP-003-9 low-impact plan must cover, section by section, and the evidence that shows it is followed at solar, wind and battery sites.
Every NERC CIP standard in one place: the version in force in the U.S., what it covers, and which ones reach low and medium impact renewable sites.
Every NERC CIP version with a U.S. effective date still ahead, in date order: CIP-003-11, CIP-015, the 2028 virtualization set. What each changes.
What follows a NERC CIP violation: usually a Compliance Exception, rarely a penalty, and filings that name no one. Plus the most violated standards.
What to ask before buying NERC CIP compliance software: how evidence is collected, whether it can touch OT devices, and what an auditor will see.
What INSM asks for inside the electronic security perimeter, and how to collect, analyze and protect the data.
Two numbers tell you whether a site is Category 2, BES, or neither.
Asset inventory worksheet, low impact plan outline, baseline checklist.
Which standards are violated most, and why CIP fines are not public.
What NERC CIP requires in an asset inventory at solar, wind and battery sites, what it does not, and how to build one that scales across a fleet.
How to watch Modbus and DNP3 traffic at a generation site without polling a single device, what to look for, and where CIP-015 does and does not apply.
Who CIP-013 applies to at solar, wind and battery sites, the six vendor topics a plan must cover, and what low impact sites still owe on vendor access.
Everything above is free. This is what GridSafe Technology builds and does.
Collects NERC CIP evidence read-only from OT and network devices, hash-chains every record and fills the RSAW worksheets. On-premises, works without internet.
How it works →
Runs the program side: CIP-002 impact categorization, CIP-003-9 policies and the low impact plan, records for every standard.
See CIPStart →
Engineers who deploy, segment and harden OT networks, and get sites ready for a CIP audit.
Our services →